Multi-Mode RCPSP with Safety Margin Maximization: Models and Algorithms
Résumé
We study here a variant of the multimode Resource Constrained Project Scheduling problem (RCPSP), which involves continuous modes, and a notion of Safety Margin maximization. Our interest was motivated by a work package inside the GEOSAFE H2020 project, devoted to the design of evacuation plans in face of natural disasters, and more specifically wildfire.
Origine | Fichiers produits par l'(les) auteur(s) |
---|